Note. Below is a description of the procedures for the example version with the K9K engine. Operations for versions with the M9R engine are similar, taking into account the design features (see general view drawing above).
Removing
1. Remove the front exhaust pipe.
2. Remove the catalytic converter.
3. Remove the engine cover.
4. Remove the intake duct and the duct connected to the turbocharger.
5. Remove oil lines.
Note. After applying the impregnating agent to the fastening nuts, make sure that the liquid has completely penetrated the thread, and then unscrew the nut.
6. Remove the turbocharger from the exhaust manifold.
Attention. Do not disassemble or adjust the turbocharger.
Installation
Installation is made in an order, the return to removal.
Note. Pour engine oil into the turbocharger oil lines.